Claytor Lake-Edgemont 138 kV (AE2-280)

Claytor Lake-Edgemont 138 kV is a 126.7 MW solar interconnection project in Montgomery, Virginia with a current status of withdrawn.

126.7 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameClaytor Lake-Edgemont 138 kV
Queue IDAE2-280
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity126.7 MW
StateVirginia
CountyMontgomery
Point of interconnection—
Requested (queue) date2019-03-29
Proposed in-service date2022-12-31
Operational date—
Withdrawn date2024-03-15
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.