Clear Water Solar (16INR0070)

Clear Water Solar is a 150.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Wink 138 kV bus (#1074).

150.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameClear Water Solar
Queue ID16INR0070
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity150.0 MW
State
County
Point of interconnectionWink 138 kV bus (#1074)
Requested (queue) date2014-11-05
Proposed in-service date2016-12-31
Operational date
Withdrawn date
DeveloperHilliard Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata