Clear Water - Waco 138 kV line (GEN-2023-034)
Clear Water - Waco 138 kV line is a 130.0 MW solar interconnection project in Sedgwick, Kansas with a current status of withdrawn. It is proposed to connect at Clear Water - Waco 138 kV line.
130.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology
Project facts
| Canonical name | Clear Water - Waco 138 kV line |
|---|---|
| Queue ID | GEN-2023-034 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | KS |
| Technology | Solar |
| Capacity | 130.0 MW |
| State | Kansas |
| County | Sedgwick |
| Point of interconnection | Clear Water - Waco 138 kV line |
| Requested (queue) date | 2023-10-02 |
| Proposed in-service date | 2026-09-01 |
| Operational date | — |
| Withdrawn date | 2026-08-10 |
| Developer | — |
| Utility / transmission owner | WERE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-15 | withdrawn_date | — | 2026-08-10 | high |
| 2026-08-11 | status | active | withdrawn | high |
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.