Sedgwick County, Kansas — Interconnection Projects

The interXdata warehouse tracks 21 interconnection projects in Sedgwick, Kansas, representing 1,939 MW of requested capacity.

21Total projects
4Active
10Operational
7Withdrawn
1,939 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar101,093 MW
Gas3375 MW
Wind2247 MW
Battery2212 MW
Other412 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Gordon Evans 138kV SubstationGEN-2017-179Wind222.0 MWwithdrawnSedgwick, Kansas
Gordon Evans 138kVGEN-2018-057Solar203.4 MWactiveSedgwick, Kansas
Buffalo Flats 345kV SubstationGEN-2017-220Solar201.6 MWactiveSedgwick, Kansas
Murray Gill 138 kV SubstationGEN-2023-186Solar200.0 MWwithdrawnSedgwick, Kansas
Murray Gill 138 kV SubstationGEN-2024-166Solar200.0 MWoperationalSedgwick, Kansas
Gordon Evans Energy Center1240_GT3Gas178.5 MWoperationalSedgwick, Kansas
Buffalo Flats 345kV SubstationGEN-2017-221Battery152.0 MWactiveSedgwick, Kansas
Clear Water - Waco 138 kV lineGEN-2023-034Solar130.0 MWwithdrawnSedgwick, Kansas
Gordan Evans 138 kV SubstationGEN-2021-061Solar100.0 MWwithdrawnSedgwick, Kansas
Gordon Evans Energy Center1240_GT2Gas98.3 MWoperationalSedgwick, Kansas
Gordon Evans Energy Center1240_GT1Gas98.3 MWoperationalSedgwick, Kansas
Gordan Evans 138kV SubstationGEN-2018-093Battery60.0 MWwithdrawnSedgwick, Kansas
Murray Gill 138 kV SubstationGEN-2022-004Solar33.0 MWactiveSedgwick, Kansas
Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV LineGEN-2017-163Wind25.0 MWwithdrawnSedgwick, Kansas
Tap on Chisholm - Grant Junction 69 kV LineGEN-2024-342Solar22.8 MWwithdrawnSedgwick, Kansas
Mulvane 27976_11Other4.1 MWoperationalSedgwick, Kansas
Mulvane 27976_10Other4.1 MWoperationalSedgwick, Kansas
Gordon Evans Energy Center1240_5Other2.9 MWoperationalSedgwick, Kansas
Maize68698_MAIZESolar1.0 MWoperationalSedgwick, Kansas
Mulvane 27976_9Other1.0 MWoperationalSedgwick, Kansas
Cheney Solar66591_SOLSolar1.0 MWoperationalSedgwick, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.