Clermont 1 (0925)

Clermont 1 is a 100.0 MW battery interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at West Babylon 69kV Substation.

100.0 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameClermont 1
Queue ID0925
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity100.0 MW
StateNew York
CountySuffolk
Point of interconnectionWest Babylon 69kV Substation
Requested (queue) date2019-10-17
Proposed in-service date2023-05-31
Operational date
Withdrawn date
DeveloperHecate Grid Clermont 1 LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.