Clewiston Sugar House (50482_TG7)

Clewiston Sugar House is a 20.0 MW other interconnection project in Hendry, Florida with a current status of operational.

20.0 MWCapacity
OperationalStatus
FPCMarket
OtherTechnology

Project facts

Canonical nameClewiston Sugar House
Queue ID50482_TG7
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologyOther
Capacity20.0 MW
StateFlorida
CountyHendry
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2006-10-01
Withdrawn date—
Developer—
Utility / transmission ownerUnited States Sugar Corp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata