Clinch River 138kV (Y2-067)

Clinch River 138kV is a 12.0 MW other interconnection project in Wise, Virginia with a current status of operational.

12.0 MWCapacity
OperationalStatus
Market
OtherTechnology

Project facts

Canonical nameClinch River 138kV
Queue IDY2-067
Statusoperational
Source statusIn Service
Market
TechnologyOther
Capacity12.0 MW
StateVirginia
CountyWise
Point of interconnection
Requested (queue) date2012-09-28
Proposed in-service date
Operational date2012-11-01
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata