Clinton 230 is a 75.0 MW solar interconnection project in Vermillion, Indiana with a current status of withdrawn. It is proposed to connect at Clinton 230.

75.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameClinton 230
Queue IDJ2712
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity75.0 MW
StateIndiana
CountyVermillion
Point of interconnectionClinton 230
Requested (queue) date2022-09-14
Proposed in-service date2027-04-15
Operational date2027-04-15
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.