Clinton 345kV Substation (J4010)

Clinton 345kV Substation is a 21.0 MW other interconnection project in De Witt, Illinois with a current status of operational. It is proposed to connect at Clinton 345kV Substation.

21.0 MWCapacity
OperationalStatus
Market
OtherTechnology

Project facts

Canonical nameClinton 345kV Substation
Queue IDJ4010
Statusoperational
Source statusActive
Market
TechnologyOther
Capacity21.0 MW
StateIllinois
CountyDe Witt
Point of interconnectionClinton 345kV Substation
Requested (queue) date2025-04-30
Proposed in-service date2027-09-30
Operational date2027-09-30
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata