Clinton-Stuart 345 kV is a 300.0 MW solar interconnection project in Clinton, Ohio with a current status of active.

300.0 MWCapacity
ActiveStatus
—Market
SolarTechnology

Project facts

Canonical nameClinton-Stuart 345 kV
Queue IDAE2-221
Statusactive
Source statusUnder Construction
Market—
TechnologySolar
Capacity300.0 MW
StateOhio
CountyClinton
Point of interconnection—
Requested (queue) date2019-03-21
Proposed in-service date2027-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata