Clipper WindPower (G81)

Clipper WindPower is a 53.0 MW wind interconnection project in Curry, Oregon with a current status of withdrawn. It is proposed to connect at BPA's 115kV transmission line near Langlois Substation.

53.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameClipper WindPower
Queue IDG81
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity53.0 MW
StateOregon
CountyCurry
Point of interconnectionBPA's 115kV transmission line near Langlois Substation
Requested (queue) date2001-10-10
Proposed in-service date2002-06-01
Operational date
Withdrawn date
DeveloperClipper Windpower
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata