Clutch City Solar Phase I is a 200.8 MW solar interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04.

200.8 MWCapacity
OperationalStatus
BrazoriaMarket
SolarTechnology

Project facts

Canonical nameClutch City Solar Phase I
Queue ID22INR0279
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBrazoria
TechnologySolar
Capacity200.8 MW
StateTexas
CountyBrazoria
Point of interconnectiontap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04
Requested (queue) date2020-01-22
Proposed in-service date
Operational date2028-07-01
Withdrawn date
DeveloperHZ Solar I, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata