CLUTCH CITY STORAGE I SLF (25INR0243)

CLUTCH CITY STORAGE I SLF is a 16.6 MW battery interconnection project in Galveston, Texas with a current status of suspended.

16.6 MWCapacity
SuspendedStatus
GalvestonMarket
BatteryTechnology

Project facts

Canonical nameCLUTCH CITY STORAGE I SLF
Queue ID25INR0243
Statussuspended
Source status—
MarketGalveston
TechnologyBattery
Capacity16.6 MW
StateTexas
CountyGalveston
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—suspendedhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata