CMEEC - Norwich Stott St Solar Hybrid (60609_PV1)

CMEEC - Norwich Stott St Solar Hybrid is a 3.5 MW solar interconnection project in New London, Connecticut with a current status of operational.

3.5 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameCMEEC - Norwich Stott St Solar Hybrid
Queue ID60609_PV1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity3.5 MW
StateConnecticut
CountyNew London
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-12-01
Withdrawn date
Developer
Utility / transmission ownerTesla Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.