CMS2 (FKA BOULDER CITY PV) is a 155.0 MW solar interconnection project in Clark, Nevada with a current status of operational. It is proposed to connect at Merchant Switchyard 230 kV.

155.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCMS2 (FKA BOULDER CITY PV)
Queue ID503
Statusoperational
Source statusCOMPLETED
Market
TechnologySolar
Capacity155.0 MW
StateNevada
CountyClark
Point of interconnectionMerchant Switchyard 230 kV
Requested (queue) date2009-07-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.