CNR Increase (474)

CNR Increase is a 1,600.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at Mystic 115 and 345 kV Stations.

1,600.0 MWCapacity
WithdrawnStatus
BOSTMarket
GasTechnology

Project facts

Canonical nameCNR Increase
Queue ID474
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGas
Capacity1,600.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionMystic 115 and 345 kV Stations
Requested (queue) date2014-08-01
Proposed in-service date2016-05-31
Operational date
Withdrawn date2015-04-09
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata