CNR Increase (474)
CNR Increase is a 1,600.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at Mystic 115 and 345 kV Stations.
1,600.0 MWCapacity
WithdrawnStatus
BOSTMarket
GasTechnology
Project facts
| Canonical name | CNR Increase |
|---|---|
| Queue ID | 474 |
| Status | withdrawn |
| Source status | W |
| Market | BOST |
| Technology | Gas |
| Capacity | 1,600.0 MW |
| State | Massachusetts |
| County | Middlesex |
| Point of interconnection | Mystic 115 and 345 kV Stations |
| Requested (queue) date | 2014-08-01 |
| Proposed in-service date | 2016-05-31 |
| Operational date | — |
| Withdrawn date | 2015-04-09 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata