CO Queue Project 2004-G4 — Wind in Lincoln County, Colorado

CO Queue Project 2004-G4 — Wind in Lincoln County, Colorado is a 100.5 MW wind interconnection project in Lincoln County, Colorado with a current status of withdrawn. It is proposed to connect at Limon 115-kV line.

100.5 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project 2004-G4 — Wind in Lincoln County, Colorado
Queue ID2004-G4
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologyWind
Capacity100.5 MW
StateColorado
CountyLincoln County
Point of interconnectionLimon 115-kV line
Requested (queue) date2004-04-02
Proposed in-service date2016-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.