CO Queue Project 2004-G7 — Wind in Weld County, Colorado
CO Queue Project 2004-G7 — Wind in Weld County, Colorado is a 153.0 MW wind interconnection project in Weld County, Colorado with a current status of withdrawn. It is proposed to connect at Ault Substation.
153.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology
Project facts
| Canonical name | CO Queue Project 2004-G7 — Wind in Weld County, Colorado |
|---|---|
| Queue ID | 2004-G7 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | CO |
| Technology | Wind |
| Capacity | 153.0 MW |
| State | Colorado |
| County | Weld County |
| Point of interconnection | Ault Substation |
| Requested (queue) date | 2004-08-27 |
| Proposed in-service date | 2009-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Western Area Power Administration - Rocky Mountain Region |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata