CO Queue Project 2007-G9 — Wind in Laramie County, Wy And Weld County, Colorado

CO Queue Project 2007-G9 — Wind in Laramie County, Wy And Weld County, Colorado is a 100.0 MW wind interconnection project in Laramie County, Wy And Weld County, Colorado with a current status of withdrawn. It is proposed to connect at Archer-Ault 230-kV line.

100.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project 2007-G9 — Wind in Laramie County, Wy And Weld County, Colorado
Queue ID2007-G9
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologyWind
Capacity100.0 MW
StateColorado
CountyLaramie County, Wy And Weld County
Point of interconnectionArcher-Ault 230-kV line
Requested (queue) date2007-11-20
Proposed in-service date2012-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata