CO Queue Project 2020-G2 — Wind in Washington County, Colorado

CO Queue Project 2020-G2 — Wind in Washington County, Colorado is a 100.0 MW wind interconnection project in Washington County, Colorado with a current status of withdrawn. It is proposed to connect at Beaver Creek - Deering Lake 115-kV.

100.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project 2020-G2 — Wind in Washington County, Colorado
Queue ID2020-G2
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologyWind
Capacity100.0 MW
StateColorado
CountyWashington County
Point of interconnectionBeaver Creek - Deering Lake 115-kV
Requested (queue) date2019-11-01
Proposed in-service date2022-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata