CO Queue Project 3RSC-2023-01 — Solar in Pueblo County, Colorado
CO Queue Project 3RSC-2023-01 — Solar in Pueblo County, Colorado is a 200.0 MW solar interconnection project in Pueblo County, Colorado with a current status of withdrawn. It is proposed to connect at Mirasol 230 kV Switching Station.
200.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology
Project facts
| Canonical name | CO Queue Project 3RSC-2023-01 — Solar in Pueblo County, Colorado |
|---|---|
| Queue ID | 3RSC-2023-01 |
| Status | withdrawn |
| Source status | Withdrawn 4/22/2026 |
| Market | CO |
| Technology | Solar |
| Capacity | 200.0 MW |
| State | Colorado |
| County | Pueblo County |
| Point of interconnection | Mirasol 230 kV Switching Station |
| Requested (queue) date | 2023-05-19 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | 2026-04-22 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata