CO Queue Project BHCT-G22 — Solar in Pueblo, Colorado

CO Queue Project BHCT-G22 — Solar in Pueblo, Colorado is a 60.0 MW solar interconnection project in Pueblo, Colorado with a current status of withdrawn. It is proposed to connect at Reader-Pueblo Airport 115kV.

60.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project BHCT-G22 — Solar in Pueblo, Colorado
Queue IDBHCT-G22
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologySolar
Capacity60.0 MW
StateColorado
CountyPueblo
Point of interconnectionReader-Pueblo Airport 115kV
Requested (queue) date2017-05-11
Proposed in-service date2020-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerBlack Hills Colorado Electric

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—withdrawnhigh

Explore related data

Source last checked2026-09-14
Data last materially changed2026-09-14
Page data generated2026-10-12

Provenance: blackhills-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata