CO Queue Project BHCT-G3 — Gas in Pueblo, Colorado
CO Queue Project BHCT-G3 — Gas in Pueblo, Colorado is a 200.0 MW gas interconnection project in Pueblo, Colorado with a current status of operational. It is proposed to connect at Airport Tap 115 kV.
200.0 MWCapacity
OperationalStatus
COMarket
GasTechnology
Project facts
| Canonical name | CO Queue Project BHCT-G3 — Gas in Pueblo, Colorado |
|---|---|
| Queue ID | BHCT-G3 |
| Status | operational |
| Source status | Complete |
| Market | CO |
| Technology | Gas |
| Capacity | 200.0 MW |
| State | Colorado |
| County | Pueblo |
| Point of interconnection | Airport Tap 115 kV |
| Requested (queue) date | 2009-04-03 |
| Proposed in-service date | — |
| Operational date | 2011-10-01 |
| Withdrawn date | — |
| Developer | Black Hills Electric Generation LLC |
| Utility / transmission owner | Black Hills Colorado Electric |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: blackhills-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata