CO Queue Project BHCT-G30 — Solar in Pueblo, Colorado

CO Queue Project BHCT-G30 — Solar in Pueblo, Colorado is a 80.0 MW solar interconnection project in Pueblo, Colorado with a current status of withdrawn. It is proposed to connect at West Station 115kV.

80.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project BHCT-G30 — Solar in Pueblo, Colorado
Queue IDBHCT-G30
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologySolar
Capacity80.0 MW
StateColorado
CountyPueblo
Point of interconnectionWest Station 115kV
Requested (queue) date2021-08-23
Proposed in-service date2024-09-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerBlack Hills Colorado Electric

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: blackhills-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata