CO Queue Project BHCT-G34 — Solar in Fremont, Colorado
CO Queue Project BHCT-G34 — Solar in Fremont, Colorado is a 24.0 MW solar interconnection project in Fremont, Colorado with a current status of withdrawn. It is proposed to connect at Skala Substation.
24.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology
Project facts
| Canonical name | CO Queue Project BHCT-G34 — Solar in Fremont, Colorado |
|---|---|
| Queue ID | BHCT-G34 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | CO |
| Technology | Solar |
| Capacity | 24.0 MW |
| State | Colorado |
| County | Fremont |
| Point of interconnection | Skala Substation |
| Requested (queue) date | 2022-07-14 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Black Hills Colorado Electric |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: blackhills-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata