CO Queue Project BHCT-G50 — Battery in Pueblo, Colorado
CO Queue Project BHCT-G50 — Battery in Pueblo, Colorado is a 50.0 MW battery interconnection project in Pueblo, Colorado with a current status of active. It is proposed to connect at sa Substation, Approximate Coordinates: 38.3188659, -1.
50.0 MWCapacity
ActiveStatus
COMarket
BatteryTechnology
Project facts
| Canonical name | CO Queue Project BHCT-G50 — Battery in Pueblo, Colorado |
|---|---|
| Queue ID | BHCT-G50 |
| Status | active |
| Source status | Active |
| Market | CO |
| Technology | Battery |
| Capacity | 50.0 MW |
| State | Colorado |
| County | Pueblo |
| Point of interconnection | sa Substation, Approximate Coordinates: 38.3188659, -1 |
| Requested (queue) date | 2024-06-12 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Black Hills Colorado Electric |
| Utility / transmission owner | Black Hills Colorado Electric |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: blackhills-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata