CO Queue Project GI-2020-12 — Wind in Elbert County, Colorado

CO Queue Project GI-2020-12 — Wind in Elbert County, Colorado is a 400.0 MW wind interconnection project in Elbert County, Colorado with a current status of withdrawn. It is proposed to connect at Waterton-Midway 345 kV line.

400.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project GI-2020-12 — Wind in Elbert County, Colorado
Queue IDGI-2020-12
Statuswithdrawn
Source statusWithdrawn 8/30/2022
MarketCO
TechnologyWind
Capacity400.0 MW
StateColorado
CountyElbert County
Point of interconnectionWaterton-Midway 345 kV line
Requested (queue) date2020-09-22
Proposed in-service date2024-12-01
Operational date
Withdrawn date2022-08-30
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata