CO Queue Project GI-2021-11 — Solar in Alamosa County, Colorado

CO Queue Project GI-2021-11 — Solar in Alamosa County, Colorado is a 19.9 MW solar interconnection project in Alamosa County, Colorado with a current status of withdrawn. It is proposed to connect at Alamosa Terminal Substation.

19.9 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project GI-2021-11 — Solar in Alamosa County, Colorado
Queue IDGI-2021-11
Statuswithdrawn
Source statusWithdrawn 09/21/2021
MarketCO
TechnologySolar
Capacity19.9 MW
StateColorado
CountyAlamosa County
Point of interconnectionAlamosa Terminal Substation
Requested (queue) date2021-08-16
Proposed in-service date2022-12-01
Operational date
Withdrawn date2021-09-21
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata