CO Queue Project GI-2021-19 — Wind in Pueblo County, Colorado

CO Queue Project GI-2021-19 — Wind in Pueblo County, Colorado is a 500.0 MW wind interconnection project in Pueblo County, Colorado with a current status of withdrawn. It is proposed to connect at Tundra Switching Station 345 kV.

500.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project GI-2021-19 — Wind in Pueblo County, Colorado
Queue IDGI-2021-19
Statuswithdrawn
Source statusWithdrawn 08/29/2022
MarketCO
TechnologyWind
Capacity500.0 MW
StateColorado
CountyPueblo County
Point of interconnectionTundra Switching Station 345 kV
Requested (queue) date2021-09-29
Proposed in-service date2025-12-31
Operational date
Withdrawn date2022-08-29
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata