CO Queue Project GI-2022-5 — Solar in Arapahoe County, Colorado
CO Queue Project GI-2022-5 — Solar in Arapahoe County, Colorado is a 300.0 MW solar interconnection project in Arapahoe County, Colorado with a current status of withdrawn. It is proposed to connect at Missle Site 345 kV Substation.
300.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology
Project facts
| Canonical name | CO Queue Project GI-2022-5 — Solar in Arapahoe County, Colorado |
|---|---|
| Queue ID | GI-2022-5 |
| Status | withdrawn |
| Source status | Withdrawn 07/03/2023 |
| Market | CO |
| Technology | Solar |
| Capacity | 300.0 MW |
| State | Colorado |
| County | Arapahoe County |
| Point of interconnection | Missle Site 345 kV Substation |
| Requested (queue) date | 2022-03-22 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | 2023-07-03 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.