CO Queue Project GI-2023-12 — Solar+Battery in Arapahoe County, Colorado

CO Queue Project GI-2023-12 — Solar+Battery in Arapahoe County, Colorado is a 199.0 MW solar+battery interconnection project in Arapahoe County, Colorado with a current status of withdrawn. It is proposed to connect at Pronghorn-Shortgrass 345 kV.

199.0 MWCapacity
WithdrawnStatus
COMarket
Solar+BatteryTechnology

Project facts

Canonical nameCO Queue Project GI-2023-12 — Solar+Battery in Arapahoe County, Colorado
Queue IDGI-2023-12
Statuswithdrawn
Source statusWithdrawn 09/27/2023
MarketCO
TechnologySolar+Battery
Capacity199.0 MW
StateColorado
CountyArapahoe County
Point of interconnectionPronghorn-Shortgrass 345 kV
Requested (queue) date2023-05-22
Proposed in-service date2026-05-31
Operational date
Withdrawn date2023-09-27
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata