CO Queue Project GI-2023-13 — Solar in Garfield County, Colorado

CO Queue Project GI-2023-13 — Solar in Garfield County, Colorado is a 52.0 MW solar interconnection project in Garfield County, Colorado with a current status of withdrawn. It is proposed to connect at Rifle-Collbran kV Line.

52.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project GI-2023-13 — Solar in Garfield County, Colorado
Queue IDGI-2023-13
Statuswithdrawn
Source statusWithdrawn 10/02/2023
MarketCO
TechnologySolar
Capacity52.0 MW
StateColorado
CountyGarfield County
Point of interconnectionRifle-Collbran kV Line
Requested (queue) date2023-05-22
Proposed in-service date2026-12-21
Operational date
Withdrawn date2023-10-02
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata