CO Queue Project GI-2023-13 — Solar in Garfield County, Colorado
CO Queue Project GI-2023-13 — Solar in Garfield County, Colorado is a 52.0 MW solar interconnection project in Garfield County, Colorado with a current status of withdrawn. It is proposed to connect at Rifle-Collbran kV Line.
52.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology
Project facts
| Canonical name | CO Queue Project GI-2023-13 — Solar in Garfield County, Colorado |
|---|---|
| Queue ID | GI-2023-13 |
| Status | withdrawn |
| Source status | Withdrawn 10/02/2023 |
| Market | CO |
| Technology | Solar |
| Capacity | 52.0 MW |
| State | Colorado |
| County | Garfield County |
| Point of interconnection | Rifle-Collbran kV Line |
| Requested (queue) date | 2023-05-22 |
| Proposed in-service date | 2026-12-21 |
| Operational date | — |
| Withdrawn date | 2023-10-02 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.