CO Queue Project GI-2023-4 — Solar in Adams County, Colorado

CO Queue Project GI-2023-4 — Solar in Adams County, Colorado is a 310.0 MW solar interconnection project in Adams County, Colorado with a current status of withdrawn. It is proposed to connect at Pawnee-Missile Site 230 kV.

310.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project GI-2023-4 — Solar in Adams County, Colorado
Queue IDGI-2023-4
Statuswithdrawn
Source statusWithdrawn 09/29/2023
MarketCO
TechnologySolar
Capacity310.0 MW
StateColorado
CountyAdams County
Point of interconnectionPawnee-Missile Site 230 kV
Requested (queue) date2023-05-18
Proposed in-service date2027-12-31
Operational date
Withdrawn date2023-09-29
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata