CO Queue Project GI-2024-01 — Solar+Battery in Weld County, Colorado
CO Queue Project GI-2024-01 — Solar+Battery in Weld County, Colorado is a 199.0 MW solar+battery interconnection project in Weld County, Colorado with a current status of withdrawn. It is proposed to connect at Canal Crossing - Ft St Vrain 345 kV line.
199.0 MWCapacity
WithdrawnStatus
COMarket
Solar+BatteryTechnology
Project facts
| Canonical name | CO Queue Project GI-2024-01 — Solar+Battery in Weld County, Colorado |
|---|---|
| Queue ID | GI-2024-01 |
| Status | withdrawn |
| Source status | WIthdrawn 05/06/2026 |
| Market | CO |
| Technology | Solar+Battery |
| Capacity | 199.0 MW |
| State | Colorado |
| County | Weld County |
| Point of interconnection | Canal Crossing - Ft St Vrain 345 kV line |
| Requested (queue) date | 2024-04-05 |
| Proposed in-service date | 2027-05-30 |
| Operational date | — |
| Withdrawn date | 2026-05-06 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.