CO Queue Project GI-2024-01 — Solar+Battery in Weld County, Colorado

CO Queue Project GI-2024-01 — Solar+Battery in Weld County, Colorado is a 199.0 MW solar+battery interconnection project in Weld County, Colorado with a current status of withdrawn. It is proposed to connect at Canal Crossing - Ft St Vrain 345 kV line.

199.0 MWCapacity
WithdrawnStatus
COMarket
Solar+BatteryTechnology

Project facts

Canonical nameCO Queue Project GI-2024-01 — Solar+Battery in Weld County, Colorado
Queue IDGI-2024-01
Statuswithdrawn
Source statusWIthdrawn 05/06/2026
MarketCO
TechnologySolar+Battery
Capacity199.0 MW
StateColorado
CountyWeld County
Point of interconnectionCanal Crossing - Ft St Vrain 345 kV line
Requested (queue) date2024-04-05
Proposed in-service date2027-05-30
Operational date
Withdrawn date2026-05-06
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata