CO Queue Project GI-2024-03 — Solar in Adams County, Colorado
CO Queue Project GI-2024-03 — Solar in Adams County, Colorado is a 150.0 MW solar interconnection project in Adams County, Colorado with a current status of active. It is proposed to connect at Pawnee-Missile Site 230 kV line.
150.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology
Project facts
| Canonical name | CO Queue Project GI-2024-03 — Solar in Adams County, Colorado |
|---|---|
| Queue ID | GI-2024-03 |
| Status | active |
| Source status | Cluster Study Underway |
| Market | CO |
| Technology | Solar |
| Capacity | 150.0 MW |
| State | Colorado |
| County | Adams County |
| Point of interconnection | Pawnee-Missile Site 230 kV line |
| Requested (queue) date | 2024-04-30 |
| Proposed in-service date | 2029-03-25 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata