CO Queue Project GI-2024-13 — Wind in Adams County, Colorado

CO Queue Project GI-2024-13 — Wind in Adams County, Colorado is a 423.0 MW wind interconnection project in Adams County, Colorado with a current status of withdrawn. It is proposed to connect at Pawnee 345 kV Substation.

423.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project GI-2024-13 — Wind in Adams County, Colorado
Queue IDGI-2024-13
Statuswithdrawn
Source statusWithdrawn 06/15/2026
MarketCO
TechnologyWind
Capacity423.0 MW
StateColorado
CountyAdams County
Point of interconnectionPawnee 345 kV Substation
Requested (queue) date2024-05-14
Proposed in-service date2028-12-01
Operational date
Withdrawn date2026-06-15
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata