CO Queue Project GI-2024-17 — Solar in Alamosa County, Colorado

CO Queue Project GI-2024-17 — Solar in Alamosa County, Colorado is a 100.0 MW solar interconnection project in Alamosa County, Colorado with a current status of withdrawn. It is proposed to connect at San Luis Valley 230 kV Substation.

100.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project GI-2024-17 — Solar in Alamosa County, Colorado
Queue IDGI-2024-17
Statuswithdrawn
Source statusWIthdrawn 05/13/2026
MarketCO
TechnologySolar
Capacity100.0 MW
StateColorado
CountyAlamosa County
Point of interconnectionSan Luis Valley 230 kV Substation
Requested (queue) date2024-05-22
Proposed in-service date2030-01-01
Operational date
Withdrawn date2026-05-13
Developer
Utility / transmission ownerPublic Service Company Of Colorado

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata