CO Queue Project GI-CS-2025-09 — Solar in Alamosa County, Colorado

CO Queue Project GI-CS-2025-09 — Solar in Alamosa County, Colorado is a 199.0 MW solar interconnection project in Alamosa County, Colorado with a current status of withdrawn. It is proposed to connect at San Luis Valley 230kV Substation.

199.0 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCO Queue Project GI-CS-2025-09 — Solar in Alamosa County, Colorado
Queue IDGI-CS-2025-09
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologySolar
Capacity199.0 MW
StateColorado
CountyAlamosa County
Point of interconnectionSan Luis Valley 230kV Substation
Requested (queue) date2025-09-18
Proposed in-service date2028-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTri-State Generation and Transmission Association

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21statusactivewithdrawnhigh
2026-08-17phase—Cluster Study Reportlow
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata