CO Queue Project GI-CS-2025-22 — Solar+Battery in Huerfano County, Colorado

CO Queue Project GI-CS-2025-22 — Solar+Battery in Huerfano County, Colorado is a 150.0 MW solar+battery interconnection project in Huerfano County, Colorado with a current status of active. It is proposed to connect at Walsenburg - Comanche 230kV Line.

150.0 MWCapacity
ActiveStatus
COMarket
Solar+BatteryTechnology

Project facts

Canonical nameCO Queue Project GI-CS-2025-22 — Solar+Battery in Huerfano County, Colorado
Queue IDGI-CS-2025-22
Statusactive
Source statusCluster Study
MarketCO
TechnologySolar+Battery
Capacity150.0 MW
StateColorado
CountyHuerfano County
Point of interconnectionWalsenburg - Comanche 230kV Line
Requested (queue) date2025-09-29
Proposed in-service date2030-02-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-17phaseCluster Study Reportlow
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata