Coastal Duke Energy Florida, 20 (FC100004)

Coastal Duke Energy Florida, 20 is a 74.9 MW solar interconnection project in Sumter, Florida with a current status of active. It is proposed to connect at Central Florida to Holder 230kV.

74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameCoastal Duke Energy Florida, 20
Queue IDFC100004
Statusactive
Source statusSw tun - Cluster
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountySumter
Point of interconnectionCentral Florida to Holder 230kV
Requested (queue) date2024-11-27
Proposed in-service date2028-06-30
Operational date
Withdrawn date
DeveloperCoastal Duke Energy Florida, LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata