Coastal Duke Energy Florida, 20 (FC100004)
Coastal Duke Energy Florida, 20 is a 74.9 MW solar interconnection project in Sumter, Florida with a current status of active. It is proposed to connect at Central Florida to Holder 230kV.
74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | Coastal Duke Energy Florida, 20 |
|---|---|
| Queue ID | FC100004 |
| Status | active |
| Source status | Sw tun - Cluster |
| Market | FL |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Sumter |
| Point of interconnection | Central Florida to Holder 230kV |
| Requested (queue) date | 2024-11-27 |
| Proposed in-service date | 2028-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Coastal Duke Energy Florida, LLC20 |
| Utility / transmission owner | Duke Energy Progress |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.