Coastal Duke Energy Florida, LLC20 (FC100009)

Coastal Duke Energy Florida, LLC20 is a 199.0 MW battery interconnection project in Pasco, Florida with a current status of active. It is proposed to connect at Anclote Substation 230 kV.

199.0 MWCapacity
ActiveStatus
FLMarket
BatteryTechnology

Project facts

Canonical nameCoastal Duke Energy Florida, LLC20
Queue IDFC100009
Statusactive
Source status10/31/2029 Con Pst rr ou gc rt ei so sn - In
MarketFL
TechnologyBattery
Capacity199.0 MW
StateFlorida
CountyPasco
Point of interconnectionAnclote Substation 230 kV
Requested (queue) date2024-12-05
Proposed in-service date
Operational date
Withdrawn date
DeveloperCoastal Duke Energy Florida, LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata