Coastal ty e (FC100000)
Coastal ty e is a 13.1 MW other interconnection project in Pasco, Florida with a current status of active. It is proposed to connect at Hudson Substation 115 kV.
13.1 MWCapacity
ActiveStatus
FLMarket
OtherTechnology
Project facts
| Canonical name | Coastal ty e |
|---|---|
| Queue ID | FC100000 |
| Status | active |
| Source status | mm ae tr erc i Da el lO lp ape er ra dat tio ion - |
| Market | FL |
| Technology | Other |
| Capacity | 13.1 MW |
| State | Florida |
| County | Pasco |
| Point of interconnection | Hudson Substation 115 kV |
| Requested (queue) date | 2024-12-04 |
| Proposed in-service date | 2026-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Coastal ty e |
| Utility / transmission owner | Duke Energy Progress |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata