Coastal ty e (FC100000)

Coastal ty e is a 13.1 MW other interconnection project in Pasco, Florida with a current status of active. It is proposed to connect at Hudson Substation 115 kV.

13.1 MWCapacity
ActiveStatus
FLMarket
OtherTechnology

Project facts

Canonical nameCoastal ty e
Queue IDFC100000
Statusactive
Source statusmm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologyOther
Capacity13.1 MW
StateFlorida
CountyPasco
Point of interconnectionHudson Substation 115 kV
Requested (queue) date2024-12-04
Proposed in-service date2026-04-01
Operational date
Withdrawn date
DeveloperCoastal ty e
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata