Cold Creek Storage 2 (26INR0291)

Cold Creek Storage 2 is a 171.8 MW other interconnection project in Schleicher, Texas with a current status of operational. It is proposed to connect at Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009).

171.8 MWCapacity
OperationalStatus
SchleicherMarket
OtherTechnology

Project facts

Canonical nameCold Creek Storage 2
Queue ID26INR0291
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketSchleicher
TechnologyOther
Capacity171.8 MW
StateTexas
CountySchleicher
Point of interconnectionTap 345kV line Big Hill (#76003) - Twin Buttes (#76009)
Requested (queue) date2023-12-04
Proposed in-service date
Operational date2028-05-28
Withdrawn date
DeveloperCold Creek Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata