Cole 345 kV is a 200.0 MW solar interconnection project in Franklin, Ohio with a current status of operational.

200.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameCole 345 kV
Queue IDAE2-214
Statusoperational
Source statusPartially in Service - Under Construction
Market—
TechnologySolar
Capacity200.0 MW
StateOhio
CountyFranklin
Point of interconnection—
Requested (queue) date2019-03-23
Proposed in-service date—
Operational date2027-12-30
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-29proposed_online_date2027-12-30—medium
2026-10-29statusactiveoperationalhigh
2026-10-29operational_date—2027-12-30medium
2026-08-26proposed_online_date2027-03-302027-12-30medium
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.