Colorado Bend II (60122_CT7)

Colorado Bend II is a 360.9 MW gas interconnection project in Wharton, Texas with a current status of operational.

360.9 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameColorado Bend II
Queue ID60122_CT7
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity360.9 MW
StateTexas
CountyWharton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-06-01
Withdrawn date
Developer
Utility / transmission ownerConstellation Power, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata