Columbia 138kV (W2-044)

Columbia 138kV is a 100.5 MW wind interconnection project in Whitley, Indiana with a current status of withdrawn.

100.5 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameColumbia 138kV
Queue IDW2-044
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity100.5 MW
StateIndiana
CountyWhitley
Point of interconnection—
Requested (queue) date2010-06-30
Proposed in-service date2011-09-01
Operational date—
Withdrawn date2011-01-05
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata