Columbia 138kV (W3-024)

Columbia 138kV is a 149.4 MW wind interconnection project in Whitley, Indiana with a current status of withdrawn.

149.4 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameColumbia 138kV
Queue IDW3-024
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity149.4 MW
StateIndiana
CountyWhitley
Point of interconnection
Requested (queue) date2010-08-26
Proposed in-service date2013-10-01
Operational date
Withdrawn date2013-04-25
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata