Columbia-Northeast 138 kV (AE2-236)

Columbia-Northeast 138 kV is a 55.0 MW solar interconnection project in Whitley, Indiana with a current status of withdrawn.

55.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameColumbia-Northeast 138 kV
Queue IDAE2-236
Statuswithdrawn
Source statusPending Termination
Market
TechnologySolar
Capacity55.0 MW
StateIndiana
CountyWhitley
Point of interconnection
Requested (queue) date2019-03-22
Proposed in-service date2026-07-29
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-26statussuspendedwithdrawnhigh
2026-07-29new_projectsuspendedhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.