Comanche Peak 1&2 Upgrade (09INR0015)

Comanche Peak 1&2 Upgrade is a 86.0 MW nuclear interconnection project with a current status of operational. It is proposed to connect at CPSES_UNIT1 22.000.

86.0 MWCapacity
OperationalStatus
ERCOTMarket
NuclearTechnology

Project facts

Canonical nameComanche Peak 1&2 Upgrade
Queue ID09INR0015
Statusoperational
Source statusoperational
MarketERCOT
TechnologyNuclear
Capacity86.0 MW
State
County
Point of interconnectionCPSES_UNIT1 22.000
Requested (queue) date2006-07-12
Proposed in-service date1990-08-13
Operational date
Withdrawn date
DeveloperTXU Power
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata