Comanche Peak 3 and 4 (15INR0002)

Comanche Peak 3 and 4 is a 3,200.0 MW nuclear interconnection project with a current status of withdrawn.

3,200.0 MWCapacity
WithdrawnStatus
ERCOTMarket
NuclearTechnology

Project facts

Canonical nameComanche Peak 3 and 4
Queue ID15INR0002
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyNuclear
Capacity3,200.0 MW
State
County
Point of interconnection
Requested (queue) date2006-09-15
Proposed in-service date2021-12-01
Operational date
Withdrawn date
DeveloperTXU Power
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata